Cross-board task dependecies help us connect multiple boards through tasks.
We can do this by choosing the “Duplicated” or “Duplictaed by” option when adding a task dependency.
Once we’ve choosen this type of dependency, we then have the option to choose weather the task we want as dependet is located in the same board or not. If we want to connect our current task to an outside task, we choose “Specifc task”.
Then, we choose specific task we want connected and the board it belonges to.
Once we’ve selected both the task and the board, we add the dependency by clicking on “Create”.